Reflection: Peaks and Pits
I think this project went pretty well. One peak (positive) about this project was that we were good at finding the problems in our design and fixing them. One pit (negative) was that we had a lot of problems in our design. We had a lot of ideas for the car design some of which we tried and they didn't work. Because of this, the rubber band car was actually our third design. A peak was we were good at communicating our ideas to each other. A pit was that we had so many ideas and so little time that we were not able to finish de-bugging in time. Some skills that we could definitely work on are time management and sticking to the original plan.
|
Summary
For this project, we had to build a car using an energy source other than gasoline. The car had to be able to carry 100 pennies for 5 meters and stop as close to the 5 meter mark as possible. My team's chosen energy source was a rubber band.
Concepts
|